Nov 19 2026 01:30
For government contractors performing cost-reimbursable federal contracts, preparing an incurred cost submission is an important part of the annual accounting process.
Throughout the fiscal year, a contractor records direct labor, materials, subcontractor charges, employee benefits, overhead, general and administrative expenses, and other costs associated with its operations.
The company may also submit invoices using provisional billing rates while its actual indirect costs continue to accumulate.
Once the fiscal year closes, those amounts must be reconciled and evaluated.
The contractor needs to determine its actual allowable indirect costs, identify the appropriate allocation bases, calculate proposed final indirect rates, and establish the costs claimed across applicable government contracts.
This process requires more than transferring numbers from a profit and loss statement into an incurred cost workbook.
A contractor must be able to support the amounts using general ledger records, payroll documentation, labor distribution reports, subcontractor information, indirect cost calculations, and billing reconciliations.
For example, a company may calculate a final overhead rate of 52%.
But can it demonstrate which expenses make up the overhead pool, which costs belong in the allocation base, how the rate was calculated, and which government contracts received the resulting allocation?
Similarly, a contractor may report $400,000 in direct labor.
Can that amount be traced to payroll, employee timekeeping, labor distribution, and the individual contracts receiving the charges?
An incurred cost submission is only as reliable as the accounting records supporting it. The goal is not simply to complete the required schedules, but to ensure that the claimed costs can be traced, reconciled, and supported.
At Peter Witts CPA PC, we help government contractors strengthen indirect cost accounting, prepare incurred cost schedules, reconcile direct and indirect expenses, and maintain the financial documentation needed for federal contract performance.
What Is a Government Contract Incurred Cost Submission?
An incurred cost submission, often called an incurred cost proposal or final indirect cost rate proposal, is a financial submission used to support the establishment of final indirect cost rates for an applicable fiscal year.
For contracts containing FAR 52.216-7, Allowable Cost and Payment, the contractor generally prepares the proposal using actual cost experience for the completed fiscal year.
The submission typically includes schedules describing:
-
Claimed indirect cost rates
-
Indirect expense pools
-
Allocation bases
-
Direct costs by contract
-
Indirect costs allocated to contracts
-
General ledger reconciliations
-
Payroll reconciliation
-
Subcontract information
-
Cumulative costs claimed and billed
-
Other applicable contract information
The schedules provide the government with information needed to evaluate the contractor's claimed costs and establish final indirect rates through the applicable process.
An Incurred Cost Submission Is Not the Same as a Tax Return
A federal income tax return focuses on taxable income and applicable tax requirements.
An incurred cost submission focuses on government contract costs, allowable expenses, indirect rate calculations, and reconciliation of amounts claimed and billed.
The two may draw from some of the same accounting records, but they serve different purposes.
An Incurred Cost Submission Is Not Automatically a Final Rate Agreement
The contractor submits proposed final rates based on its actual cost experience.
Those rates must still be established through the applicable government process.
Completing the proposal does not automatically mean the rates have been accepted as final.
Which Government Contractors Must Prepare an Incurred Cost Submission?
The requirement depends on the contract and applicable provisions.
For contracts containing FAR 52.216-7, an adequate final indirect cost rate proposal generally must be submitted within six months after the end of the contractor's fiscal year.
The provision allows reasonable written extensions for exceptional circumstances when granted by the contracting officer.
Example: Fiscal Year-End Deadline
Suppose a contractor uses a calendar fiscal year ending December 31, 2026.
Under the standard six-month requirement, its incurred cost submission would generally be due by June 30, 2027, unless an applicable written extension or other governing provision changes the deadline.
Not Every Federal Award Has the Same Requirements
A company may perform:
-
Cost-reimbursable procurement contracts
-
Firm-fixed-price contracts
-
Time-and-materials contracts
-
Labor-hour contracts
-
SBIR/STTR grants
-
Other federal assistance awards
The accounting and indirect cost requirements may differ.
A company should not assume that every federal grant or fixed-price contract independently requires the same annual incurred cost submission.
However, its accounting records for other activities may still affect the indirect allocation bases used in a government contract incurred cost proposal.
Understand the Difference Between Submission Schedules and Supporting Records
This distinction is particularly important when preparing for a government review.
Required Submission Schedules
These are the financial schedules and other information identified in FAR 52.216-7(d)(2)(iii), unless otherwise specified by the cognizant Federal agency official.
They present the contractor's claimed rates, direct costs, reconciliations, and other required information.
Supporting Financial Records
These are the underlying documents used to prepare and substantiate the submission.
Examples include:
-
Trial balance
-
General ledger
-
Payroll registers
-
Employee time records
-
Labor distribution
-
Vendor invoices
-
Subcontractor records
-
Journal entries
-
Indirect cost schedules
-
Billing registers
Supplemental Information
FAR 52.216-7(d)(2)(iv) also identifies supplemental information that is not required to determine initial proposal adequacy but may be requested during the audit process.
Examples include certain financial statements, comparative cost analyses, accounting system descriptions, and other supporting information.
Contractors should distinguish what must be included in the submission from what should be organized and available to support the claimed amounts.
Step 1: Begin With the Year-End Trial Balance
The trial balance is one of the most useful starting points for preparing an incurred cost submission.
It summarizes account balances in the general ledger for the relevant accounting period.
Depending on the system, the trial balance may include:
-
Cash and receivables
-
Accounts payable
-
Accrued liabilities
-
Payroll accounts
-
Direct labor
-
Direct materials
-
Subcontractor costs
-
Fringe benefit expenses
-
Overhead expenses
-
G&A expenses
-
Other operating costs
-
Revenue and equity accounts
The trial balance should reflect the accounting period covered by the submission.
Why the Trial Balance Matters
The incurred cost schedules should connect to the company's official accounting records.
A trial balance provides a starting point for identifying the expense accounts that form the indirect pools and direct cost schedules.
Example: Year-End Cost Accounts
| Cost Category | Trial Balance Amount |
|---|---|
| Direct labor | $600,000 |
| Direct materials and other direct costs | $240,000 |
| Fringe-related expenses | $180,000 |
| Overhead expenses | $270,000 |
| G&A expenses | $150,000 |
| Total listed expenses | $1,440,000 |
Illustrative account balances before review of allowability, pool classifications, allocation bases, and other adjustments.
These amounts are not necessarily the final costs claimed.
The contractor may need to identify unallowable expenses, correct classifications, and reconcile additional accounting details.
Step 2: Reconcile the General Ledger Before Preparing the Schedules
The general ledger should provide the primary accounting support for the submission.
Before beginning the indirect rate calculations, verify that the relevant accounts have been reconciled.
Review:
-
Payroll
-
Accounts payable
-
Accrued expenses
-
Prepaid expenses
-
Fixed assets
-
Direct contract costs
-
Indirect expenses
-
Journal entries
-
Accounting adjustments
Common General Ledger Problems
Potential issues include:
-
Expenses posted to the wrong fiscal year
-
Unsupported journal entries
-
Incorrect project coding
-
Duplicate vendor charges
-
Direct labor recorded as indirect
-
Indirect expenses charged directly to a contract
-
Unallowable costs included without proper identification
Why This Matters
If the contractor prepares its incurred cost schedules before correcting these issues, the submission may contain inconsistent or unsupported amounts.
The accounting team should establish a controlled year-end closing process and retain reconciliation documentation.
Step 3: Prepare the Indirect Cost Pool Schedules
Indirect cost pool schedules identify the expenses accumulated in the contractor's indirect cost groupings.
Depending on the company's accounting structure, these may include:
-
Fringe benefits
-
Overhead
-
G&A
-
Intermediate indirect cost pools
-
Other appropriate cost groupings
FAR 52.216-7 requires relevant schedules identifying indirect expenses by element of cost as reflected in the accounting records.
Example: Overhead Expense Pool
Suppose the company's overhead pool contains:
| Overhead Expense | Amount |
|---|---|
| Indirect technical labor | $120,000 |
| Facilities | $70,000 |
| Shared software | $30,000 |
| Other eligible overhead | $50,000 |
| Total overhead pool | $270,000 |
Illustrative figures assuming the expenses are appropriately classified and allowable.
The contractor should be able to reconcile the $270,000 to the general ledger accounts and any properly documented adjustments.
Supporting Records
Depending on the expenses, support may include:
-
Payroll reports
-
Lease agreements
-
Utility invoices
-
Software invoices
-
Vendor statements
-
Accounting entries
-
Allocation schedules
The rate calculation should be reproducible using the underlying records.
Step 4: Document the Fringe Benefit Pool
For contractors maintaining a separate fringe pool, employee benefits may represent a significant indirect expense.
The pool may include eligible costs such as:
-
Employer payroll taxes
-
Health insurance
-
Retirement contributions
-
Paid leave
-
Workers' compensation
-
Other applicable employee benefits
The precise pool and base depend on the contractor's established cost accounting methodology.
Example: Fringe Pool Support
| Fringe Expense | Amount |
|---|---|
| Employer payroll taxes | $55,000 |
| Health insurance | $70,000 |
| Retirement contributions | $30,000 |
| Other eligible benefits | $25,000 |
| Total fringe pool | $180,000 |
Illustrative amounts. The actual treatment of paid leave and other benefits must follow the company's consistent accounting practices.
What Should Reconcile?
Fringe expenses may require reconciliation to:
-
Payroll
-
Employer tax records
-
Insurance invoices
-
Retirement plan contributions
-
General ledger accounts
-
Benefit allocation schedules
The contractor should also ensure that benefit costs are not improperly recovered twice through different indirect pools.
Step 5: Reconcile the G&A Expense Pool
G&A expenses generally support the overall management and administration of the business.
Depending on the contractor's operations, these may include:
-
Executive management
-
Corporate accounting and finance
-
General legal support
-
Administrative systems
-
Corporate insurance
-
Other company-wide expenses
The incurred cost submission should identify the applicable G&A cost elements and their accounting sources.
Common Classification Issues
Potential problems include:
-
Direct project management recorded in G&A without appropriate support
-
Technical overhead mixed with corporate administration
-
Unallowable expenses included in the claimed pool
-
Similar expenses classified inconsistently
-
Expense amounts that do not match the ledger
The contractor should review its cost accounting methodology and document any corrections.
Step 6: Prepare and Reconcile the Allocation Bases
An indirect rate cannot be supported by the cost pool alone.
The contractor must also establish the appropriate allocation base.
Common bases may include:
-
Direct labor dollars
-
Direct labor hours
-
Total labor
-
Total cost input
-
Value-added cost input
-
Other appropriate measures
The selected base should reflect the applicable benefit relationship and established accounting methodology.
Example: Overhead Rate Calculation
Suppose:
| Financial Measure | Amount |
|---|---|
| Eligible overhead pool | $270,000 |
| Eligible direct labor allocation base | $600,000 |
| Calculated overhead rate | 45% |
The rate is calculated as:
$270,000 ÷ $600,000 = 45%
However, the contractor must also demonstrate where the $600,000 allocation base came from.
The Base Should Be Reproducible
The accounting team should be able to trace the base to:
-
General ledger accounts
-
Labor distribution
-
Contract cost records
-
Commercial activity
-
Internal projects
-
Appropriate adjustments
An unsupported denominator can create problems even when the cost pool is accurate.
Step 7: Identify Unallowable Costs
Not every expense recorded in the general ledger is allowable for government contract reimbursement.
FAR Part 31 addresses the allowability of costs for applicable procurement contracts.
FAR 31.201-6 governs accounting for unallowable costs.
The contractor should identify and properly treat expenses that cannot be claimed.
Examples may include certain:
-
Entertainment expenses
-
Lobbying costs
-
Penalties
-
Contributions
-
Other restricted costs
Example: G&A Pool Adjustment
Suppose the general ledger contains $160,000 in expenses initially identified with a G&A grouping.
The contractor determines that $10,000 consists of costs that must be excluded from the claimed G&A pool.
| Calculation | Amount |
|---|---|
| Recorded G&A-related expenses | $160,000 |
| Identified unallowable expenses | ($10,000) |
| Illustrative allowable G&A pool | $150,000 |
Assumes no other accounting adjustments and that the identified $10,000 is wholly unallowable for the relevant claim.
Do Not Confuse Pool Exclusions With Base Treatment
An unallowable expense may need to be excluded from a claimed indirect cost pool but still receive an appropriate share of indirect expenses through an allocation base.
The correct treatment depends on the applicable accounting methodology and FAR requirements.
The company should retain records explaining its treatment of unallowable costs.
Step 8: Reconcile Direct Costs to the General Ledger
The incurred cost submission should identify direct costs claimed by applicable cost categories.
These may include:
-
Direct labor
-
Direct materials
-
Consultants
-
Subcontractors
-
Travel
-
Other direct expenses
The claimed amounts should reconcile to the general ledger.
Example: Direct Cost Reconciliation
| Direct Cost Category | Ledger Amount | Adjustment | Claimed Amount |
|---|---|---|---|
| Direct labor | $600,000 | $0 | $600,000 |
| Materials | $100,000 | $0 | $100,000 |
| Subcontracts | $90,000 | ($5,000) | $85,000 |
| Travel and other direct costs | $50,000 | $0 | $50,000 |
| Total | $840,000 | ($5,000) | $835,000 |
Illustrative reconciliation. The $5,000 adjustment represents an identified amount excluded from the claim for a supported reason.
The contractor should maintain documentation explaining every adjustment between book costs and claimed costs.
Why This Reconciliation Is Important
If the submission shows $835,000 in direct costs while the books show $840,000, the difference should be explained.
Unreconciled differences may raise questions about the accuracy of the submission.
Step 9: Maintain Labor Distribution Records
Labor distribution is especially important for contractors whose employees work across multiple federal contracts, commercial projects, and indirect activities.
The company should be able to connect:
Employee timekeeping → Payroll → Labor distribution → General ledger → Contract costs
Example: Employee Labor Distribution
Suppose an engineer receives $6,000 in gross wages during a payroll period.
| Activity | Allocated Labor |
|---|---|
| DoD Contract A | $3,000 |
| NASA Contract B | $1,500 |
| Internal R&D | $900 |
| General Administration | $600 |
| Total | $6,000 |
Illustrative allocation based on supported work and an appropriate compensation methodology.
The labor distribution should agree with the applicable payroll and accounting records.
What Records Should Be Retained?
Relevant records may include:
-
Timesheets
-
Employee work codes
-
Payroll registers
-
Labor distribution reports
-
Payroll adjustments
-
Supervisor approvals
-
Labor transfer documentation
The contractor should also preserve a reviewable history of corrections.
Step 10: Reconcile Payroll to IRS Form 941
Payroll reconciliation is specifically addressed in FAR 52.216-7.
The required submission information includes a reconciliation of total payroll per IRS Form 941 to total labor cost distribution.
Why This Matters
IRS Form 941 reports employment tax information, including relevant taxable wages.
The contractor's labor distribution records identify payroll costs assigned to direct and indirect activities.
The figures may differ because the two records serve different purposes and may contain different reporting categories or adjustments.
The contractor should identify and explain the reconciling items.
Example: Payroll Reconciliation
| Reconciliation Item | Amount |
|---|---|
| Illustrative gross wages reported in quarterly payroll records | $900,000 |
| Additional compensation adjustment reflected in book labor | $10,000 |
| Total book labor costs | $910,000 |
| Direct labor distribution | $600,000 |
| Indirect labor distribution | $310,000 |
| Total labor distributed | $910,000 |
Illustrative reconciliation only. Actual Form 941 wage reporting, pretax deductions, compensation categories, timing differences, and related reconciliation requirements must be analyzed using the contractor's actual records.
The objective is to establish a reliable bridge between payroll-related tax filings, labor expense, and labor distribution.
Step 11: Reconcile Subcontractor Costs
Subcontractor costs may represent a substantial portion of government contract expenses.
The contractor should maintain reliable records supporting subcontract costs claimed during the fiscal year.
Relevant documentation may include:
-
Executed subcontracts
-
Subcontract modifications
-
Statements of work
-
Vendor invoices
-
Deliverables
-
Cost reports
-
Payment records
-
Approval documentation
-
General ledger transactions
Why Subcontract Information Is Required
FAR 52.216-7 includes subcontract information among the required incurred cost proposal data.
The schedule addresses such information as subcontract numbers, values, award types, amounts claimed, and subcontractor identification.
Example: Subcontract Cost Support
Suppose a contractor claims $85,000 in subcontract costs.
| Subcontractor | Claimed Fiscal-Year Cost |
|---|---|
| Engineering Consultant A | $35,000 |
| Laboratory Services B | $30,000 |
| Technical Support C | $20,000 |
| Total claimed | $85,000 |
The claimed total should reconcile to the relevant contract costs and supporting accounting records.
The company should also distinguish amounts incurred, invoiced, paid, and claimed where required.
Step 12: Prepare the Schedule of Direct Costs by Contract
A contractor managing multiple awards should be able to determine the direct costs associated with each applicable contract.
FAR 52.216-7 requires a schedule of direct costs by contract and subcontract, together with indirect expenses applied at the claimed rates.
Example: Direct Costs by Contract
| Contract | Direct Labor | Other Direct Costs | Total Direct Costs |
|---|---|---|---|
| DoD Contract A | $250,000 | $100,000 | $350,000 |
| NASA Contract B | $200,000 | $90,000 | $290,000 |
| DOE Contract C | $150,000 | $45,000 | $195,000 |
| Total | $600,000 | $235,000 | $835,000 |
Illustrative contract-level totals.
These amounts should connect to the claimed direct cost reconciliation.
Indirect Cost Allocations Must Also Be Supported
The contractor should apply its proposed indirect rates to the appropriate bases.
For example, an overhead rate based on eligible direct labor should be applied only to costs properly included in that base.
The resulting indirect allocations should reconcile to the corresponding indirect cost schedules.
Step 13: Reconcile Cumulative Claimed and Billed Costs
A contractor may have billed costs using provisional indirect rates during the fiscal year.
Its incurred cost proposal reflects actual claimed costs using proposed final indirect rates.
Those amounts may differ.
FAR 52.216-7 includes a schedule of cumulative direct and indirect costs claimed and billed by contract.
Example: Claimed vs. Billed Reconciliation
| Contract | Cumulative Claimed Costs | Cumulative Billed Costs | Difference |
|---|---|---|---|
| Contract A | $420,000 | $405,000 | $15,000 |
| Contract B | $350,000 | $342,000 | $8,000 |
| Contract C | $230,000 | $225,000 | $5,000 |
| Total | $1,000,000 | $972,000 | $28,000 |
Illustrative figures. Cumulative amounts may span multiple fiscal years, and the differences are not automatically amounts currently authorized for additional billing.
Why This Matters
The company should understand whether differences result from:
-
Provisional versus proposed final indirect rates
-
Unbilled costs
-
Prior-year adjustments
-
Billing exclusions
-
Credits
-
Cost corrections
-
Contractual limitations
These records help support later rate settlement and billing adjustments.
Step 14: Retain Provisional Billing Rate Documentation
Provisional billing rates are temporary rates used for interim reimbursement under applicable contracts.
The rates billed during the fiscal year may differ from the final rates proposed after year-end.
The contractor should retain:
-
Established provisional billing rates
-
Applicable fiscal year
-
Rate authorization or correspondence
-
Allocation bases
-
Billing calculations
-
Rate revisions
-
Government invoices
-
Reconciliation schedules
Example: Provisional vs. Proposed Final Overhead
Suppose an established provisional overhead rate was 45%.
The contractor calculates a proposed final rate of 50%.
For $200,000 in eligible contract-level base costs:
| Calculation | Amount |
|---|---|
| Overhead billed at 45% | $90,000 |
| Overhead at proposed 50% | $100,000 |
| Proposed difference | $10,000 |
Illustrative example assuming the same applicable allocation base and no other adjustments.
The difference should be tracked for the affected contract.
However, proposed final rates are not automatically established final rates, and the $10,000 is not automatically authorized for additional immediate billing.
Step 15: Maintain Records Supporting Contract-Specific Limitations
Not all otherwise allocable costs are necessarily recoverable under every federal contract.
Some agreements may contain:
-
Funding limitations
-
Indirect rate ceilings
-
Cost-sharing terms
-
Contract-specific exclusions
-
Approval requirements
-
Other negotiated restrictions
The incurred cost submission should reflect applicable contract requirements.
Contract Documentation to Retain
Useful records include:
-
Executed contract
-
Contract modifications
-
Funding authorizations
-
Billing instructions
-
Rate ceilings
-
Applicable approvals
-
Relevant contracting officer correspondence
Why This Matters
A contractor may calculate an actual indirect rate that exceeds the reimbursement ceiling applicable to one contract.
The accounting team should distinguish actual cost allocation from amounts recoverable under that contract.
A higher calculated rate does not automatically increase authorized funding.
Step 16: Identify Cost Transfers and Prior-Period Adjustments
Cost transfers and accounting corrections may affect the claimed amounts.
Examples include:
-
Labor moved between projects
-
Vendor costs assigned to the wrong contract
-
Direct expenses reclassified as indirect
-
Unsupported costs removed
-
Prior-year adjustments
-
Billing corrections
These transactions should be supported by appropriate documentation.
What the Adjustment File Should Show
-
Original transaction
-
Reason for correction
-
Correct cost objective
-
Amount
-
Accounting period
-
Approval
-
General ledger impact
-
Indirect rate implications
-
Billing consequences
Why Corrections Need Careful Review
A legitimate cost transfer may change both contract direct costs and the indirect allocation base.
The contractor should evaluate the full accounting impact rather than simply moving the original expense.
Prior-year corrections may require additional consideration if incurred cost proposals or final rates have already been submitted or established.
Step 17: Prepare the Required Incurred Cost Schedules
DCAA provides the Incurred Cost Electronically (ICE) Model as a tool for preparing incurred cost proposals.
The model uses schedules corresponding to the information required by FAR 52.216-7.
Common ICE Schedule Framework
| Schedule | Main Purpose |
|---|---|
| A | Summary of claimed indirect rates |
| B | G&A expense pool |
| C | Final indirect cost pools, such as overhead |
| D | Intermediate indirect cost pools, where applicable |
| E | Claimed allocation bases |
| F | Facilities capital cost of money computation |
| G | Reconciliation of book and claimed direct costs |
| H / H-1 | Direct costs by contract and government participation |
| I | Cumulative claimed and billed costs |
| J | Subcontract information |
| K | Time-and-materials and labor-hour contract information |
| L | Payroll reconciliation |
| M | Agreements, approvals, and accounting changes |
| N | Certificate of final indirect costs |
| O | Contract closing information |
The actual schedules and content should follow the applicable requirements and the company's accounting methodology.
Not Every Schedule Requires the Same Type of Information
For example, a contractor without certain intermediate cost pools or applicable T&M/LH activity may have different schedule content from a contractor with those activities.
However, contractors should follow the requirements of FAR 52.216-7 and any instructions from the cognizant Federal agency official rather than simply omitting schedules without support.
Does DCAA Require Every Contractor to Use the ICE Model?
The DCAA ICE Model is a preparation tool.
It is not the only possible format for an adequate incurred cost proposal.
The contractor remains responsible for ensuring that the submission contains the required information and accurate supporting data.
Step 18: Understand the Certificate of Final Indirect Costs
FAR 52.216-7 includes a certificate of final indirect costs among the required submission information.
The certification is associated with FAR 52.242-4.
It addresses the contractor's responsibility for appropriately identifying and excluding expressly unallowable costs from the final indirect cost rate proposal.
Why Certification Matters
The certification is not merely an administrative attachment.
It requires an authorized company official to certify the submission in accordance with the applicable clause.
The accounting team should therefore complete the relevant cost allowability reviews before management signs.
Review Before Certification
The company should evaluate:
-
Unallowable costs
-
Pool classifications
-
General ledger reconciliations
-
Accounting adjustments
-
Claimed rate calculations
-
Supporting schedules
The authorized official should have an appropriate basis for executing the certification.
Step 19: Understand Which Records Are Supplemental
FAR 52.216-7 identifies supplemental information that may be requested during the audit process but is not required to determine initial proposal adequacy.
Examples include:
-
Comparative analyses of indirect expense pools
-
Financial statements or trial balance information
-
Accounting system descriptions
-
Procedures for identifying unallowable costs
-
Certain organizational information
-
Contract briefings
-
Other relevant records
Why Contractors Should Prepare These Records
A proposal may meet initial adequacy requirements while still requiring additional support during a subsequent review.
The contractor should not assume that submitting the required schedules eliminates the need to maintain underlying documentation.
Example: Expense Pool Comparison
Suppose a contractor's overhead expense pool increases from $220,000 in the prior year to $270,000 in the current year.
An expense comparison can help identify whether the $50,000 increase resulted from staffing, facilities, technical support, or other changes.
This analysis may be useful when explaining rate variances.
Step 20: Build a Supporting Documentation File by Schedule
A practical approach is to organize records according to the incurred cost schedules they support.
For example:
Schedule A — Rate Summary
Maintain final rate calculations, pool totals, base totals, and rate reconciliation.
Schedules B, C, and D — Indirect Cost Pools
Maintain general ledger details, expense classifications, allowable cost adjustments, and intermediate allocation support.
Schedule E — Allocation Bases
Maintain labor distribution, direct cost summaries, and other records supporting the selected bases.
Schedule G — Book-to-Claim Reconciliation
Maintain the trial balance, direct cost accounts, journal entries, and explanations for adjustments.
Schedule H — Contract Costs
Maintain contract-level direct cost reports and applicable indirect allocation calculations.
Schedule I — Claimed and Billed Costs
Maintain billing registers, contract invoices, cumulative cost reports, and reconciliation schedules.
Schedule J — Subcontracts
Maintain subcontract registers, agreements, modifications, and supporting cost records.
Schedule L — Payroll
Maintain quarterly Forms 941, payroll registers, labor distribution, and reconciling items.
Schedule M — Changes and Agreements
Maintain relevant government approvals, accounting policy changes, and organizational change documentation.
Schedule N — Certification
Maintain the properly executed certification and management review support.
This structure can make the submission easier to prepare, review, and explain.
Step 21: Establish a Documented Audit Trail
A reliable incurred cost submission should allow the contractor to trace costs from their original records to the final schedules.
For a vendor expense, the audit trail may follow:
Vendor invoice → Approval → Contract or cost pool classification → General ledger → Indirect rate or direct cost schedule → Incurred cost proposal
For employee labor:
Timesheet → Payroll register → Labor distribution → General ledger → Contract cost or indirect pool → Incurred cost proposal
For government billing:
Contract cost report → Provisional billing calculation → Government invoice → Cumulative billed schedule → Final rate reconciliation
These connections are particularly useful when responding to government questions.
A contractor should be able to reproduce submitted figures without relying on undocumented assumptions.
Step 22: Review the Submission for Internal Consistency
Before submission, compare the schedules with one another.
For example:
-
Do indirect rate calculations agree with the pool and base schedules?
-
Do direct cost totals agree with the book-to-claim reconciliation?
-
Does the labor distribution agree with payroll?
-
Do contract-level costs agree with the direct cost schedules?
-
Do cumulative claimed and billed amounts reconcile?
-
Are subcontract amounts consistent across relevant schedules?
-
Are adjustments documented?
-
Are accounting changes explained?
Example: Indirect Cost Reconciliation
Suppose:
| Financial Measure | Amount |
|---|---|
| Claimed overhead pool | $270,000 |
| Claimed allocation base | $600,000 |
| Calculated overhead rate | 45% |
The corresponding contract-level allocations should follow the rate and appropriate allocation base.
If the reported allocations do not agree with the underlying calculations, the difference requires investigation.
The objective is a consistent submission supported by reliable accounting data.
Step 23: Perform a Pre-Submission Adequacy Review
A contractor should review the submission before sending it to the government.
DCAA publishes an Incurred Cost Submission Adequacy Checklist that can help contractors evaluate the completeness of their proposals.
Questions to Ask
-
Are the required schedules included?
-
Are claimed rates calculated correctly?
-
Are pools and bases identified?
-
Do the schedules reconcile?
-
Is payroll reconciliation complete?
-
Are direct costs supported?
-
Are subcontract disclosures complete?
-
Are cumulative claimed and billed costs reported?
-
Are applicable agreements and changes identified?
-
Is the required certification completed?
-
Is additional support available when requested?
Why an Adequacy Review Matters
An incomplete proposal can delay the process of establishing final rates.
The contractor may need to correct and resubmit financial schedules or provide additional supporting information.
A structured pre-submission review can help identify issues before they become part of the government review.
Step 24: Prepare for Questions After Submission
Submitting the proposal is an important milestone, but it does not necessarily conclude the process.
The government may review the adequacy of the proposal and request supporting records.
Depending on the circumstances, the review may involve:
-
Expense pool testing
-
Payroll reconciliation
-
Direct cost support
-
Subcontractor costs
-
Unallowable expense treatment
-
General ledger reconciliation
-
Indirect allocation bases
-
Billing adjustments
-
Accounting practice changes
Maintain a Response Tracking Process
A contractor may benefit from maintaining a log identifying:
-
Information requested
-
Responsible employee
-
Supporting documents
-
Date requested
-
Date provided
-
Remaining questions
-
Follow-up actions
This helps organize responses and preserve the supporting documentation history.
Step 25: Understand What Happens After Final Rates Are Established
For contracts containing FAR 52.216-7, the contractor must reconcile billings after final indirect rates are settled.
The clause generally requires updating billings on affected contracts and the cumulative claimed-and-billed schedule within 60 days after settlement.
A physically complete contract may also require a completion invoice or voucher after the final rates for all applicable years have been settled.
Under the standard clause, that completion invoice generally must be submitted within 120 days after settlement, unless the contracting officer approves a longer period in writing.
Final Rates Do Not Automatically Change Contract Ceilings
The final rate agreement does not itself increase contract obligations, monetary ceilings, or specific cost allowances.
The contractor should evaluate applicable funding limits and other restrictions when reconciling costs.
Why Historical Billing Records Matter
If provisional indirect rates differ from the final established rates, the contractor needs reliable records showing:
-
Amounts previously billed
-
Rates used
-
Applicable allocation bases
-
Final indirect costs
-
Contract adjustments
-
Credits or additional amounts due
This is another reason to maintain cumulative billing reconciliations throughout the year.
Common Incurred Cost Submission Documentation Mistakes
1. Preparing Schedules Before Closing the Books
Unreconciled accounting records can produce inconsistent claimed amounts.
2. Using Indirect Cost Pools That Do Not Match the General Ledger
The company should reconcile claimed pool expenses to the official accounting records.
3. Failing to Support Allocation Bases
The denominator of an indirect rate must be appropriately documented.
4. Omitting Unallowable Cost Adjustments
Recorded business expenses are not automatically allowable government costs.
5. Failing to Reconcile Payroll and Labor Distribution
The required payroll reconciliation should be supported by reliable records.
6. Incomplete Subcontractor Information
Subcontract data should be consistent with applicable incurred cost reporting requirements.
7. Missing Explanations for Book-to-Claim Differences
Every material adjustment should have a documented basis.
8. Treating Provisional Billing Rates as Final Rates
Provisional rates support interim billing; final rates follow the applicable establishment process.
9. Failing to Reconcile Cumulative Claimed and Billed Costs
Contractors should be able to identify the differences between claimed costs and prior billing.
10. Assuming a Completed ICE Workbook Guarantees Adequacy
The contractor remains responsible for accurate calculations, required information, and supporting records.
Government Contract Incurred Cost Records Checklist
Before preparing or submitting an incurred cost proposal, review the following:
-
Applicable contracts and FAR 52.216-7 requirements have been identified.
-
The correct fiscal year has been confirmed.
-
The submission deadline has been documented.
-
The general ledger is closed and reconciled.
-
The year-end trial balance is available.
-
Accounting adjustments are documented.
-
Indirect cost pools are defined.
-
Fringe expense schedules are reconciled.
-
Overhead expense schedules are reconciled.
-
G&A expense schedules are reconciled.
-
Intermediate cost pools are supported where applicable.
-
Allocation bases are appropriate and documented.
-
Indirect rate calculations are reproducible.
-
Unallowable costs are identified and treated appropriately.
-
Direct costs reconcile to the general ledger.
-
Book-to-claim differences are explained.
-
Employee timekeeping records are available.
-
Labor distribution reconciles to payroll.
-
Payroll records reconcile to quarterly Forms 941.
-
Direct labor by contract is supported.
-
Vendor and consultant costs are documented.
-
Subcontractor costs are reconciled.
-
Required subcontract information is available.
-
Contract-level direct and indirect costs are calculated.
-
Government participation information is prepared where required.
-
Provisional billing rates are documented.
-
Cumulative claimed and billed costs are reconciled.
-
Contract-specific ceilings and limitations are reviewed.
-
Prior-period cost transfers are evaluated.
-
Accounting changes and relevant agreements are identified.
-
Applicable T&M and labor-hour information is prepared.
-
Contract closing information is reviewed.
-
The certificate of final indirect costs is completed appropriately.
-
Required incurred cost schedules are included.
-
Supplemental documentation is organized for review.
-
Management has completed a pre-submission adequacy review.
-
Records are retained and accessible.
If several items remain incomplete, the contractor may benefit from an incurred cost records assessment before submitting its proposal.
Frequently Asked Questions About Government Contract Incurred Cost Submissions
What Financial Records Are Needed for an Incurred Cost Submission?
Depending on the contractor's operations, relevant records include the trial balance, general ledger, indirect cost schedules, allocation bases, direct cost reports, payroll, labor distribution, subcontract information, billing reconciliations, and other supporting documentation.
Is an Incurred Cost Submission Required Every Year?
For contracts containing FAR 52.216-7, an adequate final indirect cost rate proposal generally must be submitted after each fiscal year, subject to the clause's provisions and applicable arrangements.
Not every federal award has the same requirement.
When Is an Incurred Cost Submission Due?
Under FAR 52.216-7, the standard deadline is within six months after the end of the contractor's fiscal year.
Reasonable written extensions for exceptional circumstances may be granted.
Is the Trial Balance a Required ICE Schedule?
The trial balance is not itself one of the schedules listed in FAR 52.216-7(d)(2)(iii).
However, it provides important supporting accounting information and is among the financial data that may be requested during an audit.
What Is the Purpose of Schedule G?
Schedule G supports reconciliation between the contractor's books of account and the direct costs claimed in the incurred cost proposal.
Why Is Payroll Reconciliation Required?
FAR 52.216-7 requires reconciliation between total payroll reported on IRS Form 941 and the contractor's total labor cost distribution.
This helps establish consistency between payroll-related reporting and cost accounting records.
Are Subcontractor Costs Included?
Yes, applicable subcontract costs and subcontract information are included in the required proposal data.
The contractor should retain supporting agreements, invoices, and related accounting records.
Does DCAA Require the ICE Model?
DCAA provides the ICE Model as a standard tool for preparing incurred cost proposals.
The required information may be submitted using an adequate alternative format consistent with the applicable requirements.
What Is the Difference Between an Incurred Cost Proposal and Final Indirect Rates?
An incurred cost proposal contains the contractor's claimed costs and proposed final indirect rates.
Final rates are established through the applicable government process.
Can a Contractor Adjust Its Incurred Cost Submission?
Corrections may be necessary when the contractor identifies errors.
However, the appropriate treatment depends on the nature of the adjustment and the status of the submission or final rate settlement.
The contractor should preserve a clear accounting and documentation trail.
What Happens if a Contractor Has Incomplete Supporting Records?
The contractor may face questions about the completeness or supportability of its claimed costs.
Depending on the issue, the proposal may require correction or additional documentation, and unsupported costs may be questioned or disallowed.
Can an Outside Accounting Firm Help Prepare Incurred Cost Records?
Yes.
A government contract accounting specialist can help reconcile financial records, develop indirect cost schedules, review allowability, prepare required proposal information, and identify documentation gaps before submission.
Final Thoughts: An Incurred Cost Submission Begins With Reliable Accounting Records
Preparing a government contract incurred cost submission is not simply a matter of completing annual financial schedules.
It requires an accounting system that can identify and support the costs claimed for the relevant fiscal year.
Contractors should be able to reconcile their indirect cost pools and allocation bases to the general ledger, support labor charges through payroll and timekeeping, identify unallowable expenses, document subcontractor costs, and explain differences between claimed and billed amounts.
These responsibilities become more complex as businesses expand into additional cost-reimbursable contracts.
A reliable year-end submission therefore depends on consistent accounting procedures throughout the year.
Monthly reconciliations, accurate labor distribution, appropriate cost classifications, and organized supporting documentation can help reduce the amount of reconstruction required when the fiscal year closes.
At Peter Witts CPA PC, we help federal contractors strengthen cost accounting procedures, prepare indirect rate calculations, and organize the financial records supporting incurred cost submissions.
Founded by a former DCAA auditor, our firm brings decades of specialized government contract accounting experience to indirect rate management, incurred cost preparation, federal financial reporting, and DCAA compliance support.
Need Help Preparing Your Incurred Cost Records?
If your company is approaching its fiscal year-end, preparing its first incurred cost submission, or having difficulty reconciling indirect costs, payroll, subcontractor expenses, and government billing records, now may be the right time to review your financial documentation.
Peter Witts CPA PC can help evaluate your indirect cost schedules, trial balance, general ledger reconciliations, labor distribution, unallowable cost classifications, subcontractor records, and cumulative claimed-and-billed amounts.
Whether your company is preparing its first submission under FAR 52.216-7 or managing annual submissions across multiple cost-reimbursable contracts, our team can help identify accounting gaps and strengthen the financial processes supporting your submission.
Prepare Your Incurred Cost Records
Schedule a consultation with Peter Witts CPA PC to review your incurred cost documentation, evaluate reconciliation gaps, and prepare more supportable federal contract financial schedules.


