Nov 25 2026 06:00
In short:"DCAA-compliant" means your accounting system meets the criteria on the SF 1408 pre-award survey: it separates direct and indirect costs, tracks costs by contract, allocates overhead consistently, excludes unallowable costs, and is backed by daily timekeeping. It is about how the system is set up and used, not which software you buy.
From the Peter Witts CPA PC team, led by a former DCAA auditor · November 2026
The criteria, in plain English
| SF 1408 asks whether your system... | What that means day to day |
|---|---|
| Separates direct and indirect costs | Separate accounts for project costs and overhead |
| Identifies and accumulates direct costs by contract | Every project cost carries a contract or job code |
| Allocates indirect costs logically and consistently | Written pool and base definitions, applied every month |
| Keeps costs under general ledger control | Job cost reports tie to the general ledger |
| Has a timekeeping system that ties labor to cost objectives | Daily timesheets by project, with approvals |
| Has a labor distribution system | Payroll is charged to projects based on those timesheets |
| Determines costs charged to contracts at least monthly | Monthly close with job cost reports |
| Excludes unallowable costs | Unallowables coded separately and kept out of rates and bills |
| Can identify costs by contract line item, if required | Sub-codes when a contract asks for them |
| Separates preproduction from production costs, if relevant | Mostly for manufacturers |
| Supports billing and pricing | Invoices and proposals come from the same books |
The two that fail most often
Timekeeping and unallowable costs. A system can look perfect on paper and still fail if timesheets are filled in weekly from memory, or if meals and entertainment sit in the same account as rent.
Policies matter as much as software
An auditor reads your written procedures, then checks that people follow them. A short accounting manual covering timekeeping, cost coding, rate calculation and billing is part of the system.
FAQ
Is there a list of approved systems? No. DCAA evaluates your system as set up and used, not a product.
When does this become mandatory? When you pursue cost-type work, such as many DoD Phase II SBIR contracts.
Want a system built to pass the first time? We design it from the auditor's checklist backward. Request a consultation.


