An approved SBIR/STTR budget is more than a financial estimate included in a federal proposal.
Once an award begins, that budget becomes an important reference point for monitoring research expenditures, staffing costs, consultant commitments, indirect expenses, and remaining funding.
But as project activities progress, the financial picture can become more complicated.
Employees divide their time among multiple projects. Vendor invoices arrive after purchases are made. Consultant costs change. Indirect rates may differ from original assumptions. Research partners submit invoices on different schedules. Federal drawdowns may not match the expenditures currently recorded in the general ledger.
By the time an agency financial reporting deadline approaches, a company may discover that its approved budget, accounting records, and payment information do not agree.
The purpose of SBIR/STTR budget reconciliation is to identify and resolve these differences before they affect federal reporting, reimbursement requests, or future funding decisions.
At Peter Witts CPA PC, we help federally funded companies strengthen budget reconciliation, project cost tracking, indirect rate management, and financial reporting processes so accounting issues can be addressed during award performance rather than at the last minute.
What Is SBIR/STTR Budget Reconciliation?
SBIR/STTR budget reconciliation is the process of comparing approved award funding with the company's recorded expenditures, supporting documentation, and other relevant financial activity.
It involves more than identifying how much money remains.
A complete reconciliation should help determine:
-
Whether expenses are assigned to the correct award.
-
Whether direct costs are supported.
-
Whether payroll charges agree with timekeeping and labor distribution.
-
Whether indirect costs are calculated appropriately.
-
Whether vendor and consultant expenses are recorded accurately.
-
Whether subaward spending is properly tracked.
-
Whether federal drawdowns reconcile to payment and accounting records.
-
Whether budget variances require investigation.
-
Whether reported expenditures reflect the company's official accounting records.
-
Whether the award remains financially on track.
The goal is to establish a reliable financial picture of the award before information is submitted to a federal agency.
For federal assistance awards subject to Uniform Guidance, 2 CFR 200.302 requires financial management systems to support accurate financial reporting, maintain appropriate expenditure records, and compare actual expenditures with budget amounts.
These responsibilities should be built into the company's ongoing accounting process.
Why Budget Reconciliation Matters Before Agency Reporting
A federal financial report should reflect supported award expenditures.
It should not be based solely on the original proposal budget, the amount of funding remaining in a payment system, or an informal spreadsheet maintained outside the accounting records.
If the company submits a report before completing reconciliation, it may overlook:
-
Payroll assigned to the wrong project.
-
Invoices that have not been recorded.
-
Duplicate expenses.
-
Incorrect indirect cost calculations.
-
Costs outside the authorized period.
-
Unallowable or unsupported charges.
-
Research partner spending discrepancies.
-
Federal payment adjustments.
-
Unexplained budget variances.
These issues can create reporting corrections, agency questions, delayed financial closeout, or additional compliance work.
NIH's financial management guidance also emphasizes the importance of systems capable of identifying unusually large unobligated balances, accelerated spending, inappropriate cost transfers, and other questionable financial activity.
A well-established reconciliation process helps identify these concerns while there is still time to address them.
Step 1: Start With the Current Approved Award Budget
The first step is confirming that the company is using the correct budget.
The original proposal budget may not match the final approved award.
During award negotiation or performance, the funding agency may have adjusted amounts, imposed restrictions, or approved modifications.
Review:
-
Official Notice of Award or executed contract
-
Current approved budget
-
Budget justification
-
Award modifications
-
Period of performance
-
Funding limitations
-
Approved indirect cost treatment
-
Rebudgeting provisions
-
Applicable prior approvals
The reconciliation should use the current authorized financial structure as its baseline.
Why the Original Proposal Budget May Be Misleading
Suppose a company requested $500,000 but received an award authorizing $460,000.
If accounting reports continue using the original $500,000 budget, management may overstate the funding available.
Similarly, an approved budget modification may change the amounts allocated to consultants, equipment, or other categories.
The company should maintain a clear record of its current authorized budget and any changes.
Step 2: Prepare a Current Budget-to-Actual Report
Once the approved budget is confirmed, compare the authorized amounts with actual expenditures.
A budget-to-actual report should identify:
-
Approved budget
-
Actual costs recorded
-
Remaining balance
-
Significant variances
-
Outstanding commitments, where appropriate
-
Expected future costs
Example: SBIR/STTR Budget-to-Actual Report
Consider a hypothetical SBIR Phase II award.
| Budget Category | Approved Budget | Actual Costs | Remaining |
|---|---|---|---|
| Direct Labor | $240,000 | $165,000 | $75,000 |
| Fringe Benefits | $60,000 | $42,000 | $18,000 |
| Materials and Supplies | $75,000 | $58,000 | $17,000 |
| Consultants | $85,000 | $52,000 | $33,000 |
| Travel | $15,000 | $7,000 | $8,000 |
| Indirect Costs | $125,000 | $96,000 | $29,000 |
| Total | $600,000 | $420,000 | $180,000 |
Illustrative figures only. Actual budget categories, indirect cost treatment, and permitted spending depend on the award.
At first glance, the report shows $180,000 in remaining budget.
However, this figure does not establish that all remaining funds are available for new spending.
The company may still have outstanding consultant commitments, unrecorded invoices, payroll obligations, or additional indirect costs.
The reconciliation should identify these items before management relies on the remaining balance.
Step 3: Reconcile the Project Ledger to the General Ledger
A project ledger identifies expenditures associated with a specific award or project.
The general ledger contains the company's overall financial transactions.
These records should agree.
Before preparing an agency report, compare the project-level expenditure report against the corresponding general ledger activity.
Review:
-
Award or project codes
-
Expense accounts
-
Transaction dates
-
Journal entries
-
Direct cost classifications
-
Indirect cost allocations
-
Adjustments
-
Credits and refunds
-
Accruals, where applicable
Common Project Coding Problems
An SBIR/STTR company may have multiple activities occurring simultaneously.
For example:
-
NIH Phase II research
-
NSF Phase I development
-
Internal R&D
-
Commercial customer work
-
General administrative activities
A vendor expense may be recorded under the wrong project.
An employee's labor may be charged to a previous award.
A shared software subscription may be assigned entirely to one project even though several activities benefited.
These errors may not affect the company's overall financial statements significantly, but they can materially affect an individual award's reported costs.
What to Do When the Records Do Not Agree
Identify the underlying transactions and determine whether a correction is appropriate.
Each correction should have:
-
A documented reason
-
Supporting records
-
Correct project or account classification
-
Appropriate authorization
-
A clear audit trail
Costs should not be moved between projects simply to use available award budget.
Corrections should reflect the activity that actually benefited and the applicable accounting requirements.
Step 4: Reconcile Payroll to Timekeeping
Payroll is frequently one of the largest components of an SBIR/STTR budget.
Because employees and founders may work across several activities, payroll reconciliation requires more than confirming that wages were paid.
Start with:
-
Payroll registers
-
Employee compensation records
-
Pay periods
-
Timesheets
-
Project codes
-
Direct award hours
-
Indirect hours
-
Non-award hours
-
Payroll journal entries
The company should be able to explain how compensation was assigned to the award.
Example: Payroll Allocation Difference
Suppose an engineer receives $5,000 in gross wages during a pay period.
Their supported time records indicate:
| Activity | Allocated Compensation |
|---|---|
| NIH SBIR Research | $3,000 |
| Commercial Customer Project | $1,250 |
| General Administration | $750 |
| Total | $5,000 |
Illustrative allocation assuming an appropriate, documented methodology.
If the accounting system charged $4,000 to the NIH award, the company should investigate the $1,000 difference.
Possible causes include incorrect project coding, an outdated allocation, or a payroll journal entry that does not reflect the supported activity records.
The company should resolve the difference before relying on the labor costs for federal financial reporting.
Step 5: Review Labor Distribution Reports
Timekeeping records where employees worked.
Payroll records how much employees were paid.
Labor distribution reports connect those records by assigning compensation to the correct cost objectives.
Before agency reporting, verify that:
-
Total distributed labor reconciles to payroll.
-
Direct labor is assigned to the appropriate awards.
-
Indirect labor is classified consistently.
-
Founder compensation is supported.
-
Commercial and internal activities are identifiable.
-
Payroll allocations are reflected in the general ledger.
-
Corrections have been reviewed and documented.
This step is particularly important when the company maintains labor distribution schedules outside its primary accounting system.
A report generated in a spreadsheet may be mathematically correct but still fail to reconcile with the payroll entries posted to the general ledger.
The accounting team should investigate any differences.
Why Founder Labor Deserves Additional Review
Founders may perform technical research while also managing fundraising, commercial product development, hiring, and general operations.
Not all founder activity necessarily qualifies as a direct award charge.
Founder compensation should be reconciled using the appropriate payroll and effort documentation, with non-award activities treated according to applicable requirements.
Step 6: Reconcile Fringe Benefits
Fringe benefit expenses can significantly affect award labor costs.
Depending on the company's accounting structure, fringe may include:
-
Employer payroll taxes
-
Health insurance
-
Retirement contributions
-
Workers' compensation
-
Paid leave
-
Other employee benefits
Before financial reporting, review how these costs are accumulated and assigned.
The company should determine whether:
-
Fringe expenses are recorded completely.
-
Applicable payroll-related costs are included.
-
The allocation base is correct.
-
The appropriate rate or allocation method is being used.
-
Fringe charges reconcile to supporting schedules.
-
Costs are not duplicated elsewhere.
For example, if the company maintains a separate fringe benefit pool, the calculation should agree with the applicable payroll records, general ledger accounts, and allocation methodology.
An incorrect fringe calculation may affect both direct project costs and indirect cost reporting.
Step 7: Review Indirect Cost Calculations
Indirect costs are another common source of reconciliation differences.
An SBIR/STTR company may use one or more indirect cost pools to accumulate expenses that support multiple activities.
Depending on the accounting structure, these may include:
-
Fringe benefits
-
Overhead
-
General and administrative expenses
Before submitting an agency report, review:
-
Applicable indirect cost rate
-
Cost pools
-
Allocation bases
-
Actual indirect expenses
-
Direct cost information used in the bases
-
Unallowable cost treatment
-
Prior adjustments
-
Rate schedules
-
Amounts charged to the award
Proposal Rates and Actual Costs May Differ
A rate used to prepare the original proposal may not reflect the company's current financial position.
Staffing, facilities, administrative expenses, and commercial activities may have changed during the award.
However, the company should not automatically substitute a newly calculated actual rate for the rate authorized under the award.
The correct treatment depends on the applicable rate agreement, award conditions, and financial reporting requirements.
Example: Indirect Cost Calculation
Suppose a company uses a supported overhead rate of 50% applied to an eligible direct labor base.
If the eligible labor base is $100,000, the calculated overhead amount would be $50,000.
If the accounting records show $56,000 charged to the award, the company should determine why.
The difference may involve:
-
Incorrect allocation base
-
Wrong rate
-
Prior-period adjustment
-
Duplicate entry
-
Improper labor classification
-
Unsupported journal entry
The difference should be resolved or appropriately explained before financial reporting.
Step 8: Review Vendor Invoices and Expense Documentation
Vendor transactions should be reviewed for completeness, classification, and supporting documentation.
Review:
-
Vendor invoices
-
Purchase orders
-
Receipts
-
Payment records
-
Expense approvals
-
Project codes
-
Service or delivery dates
-
Credits and refunds
-
General ledger postings
Watch for Unrecorded Invoices
A company may have received goods or services but not yet recorded the related cost.
Depending on the applicable accounting and reporting basis, this may affect the period in which the expense should be recognized.
The accounting team should understand the difference between incurred expenses, unpaid liabilities, and future purchase commitments.
These are not interchangeable.
Watch for Duplicate Transactions
Duplicate expenses may arise when:
-
An invoice is entered twice.
-
A credit card purchase and its vendor invoice are both recorded as separate expenses.
-
An employee reimbursement duplicates a company-paid purchase.
-
A vendor credit is not applied correctly.
The reconciliation should identify and correct duplicate charges before the award costs are reported.
Step 9: Reconcile Consultant and Subaward Costs
Many SBIR/STTR awards involve outside technical specialists, universities, research institutions, or other partners.
These costs should be reviewed separately from ordinary operating expenses.
For consultants, examine:
-
Executed agreements
-
Approved scope of work
-
Authorized rates
-
Invoice detail
-
Deliverables
-
Service dates
-
Payment records
-
Applicable approvals
For subawards and subcontracts, also review partner budgets, financial reports, monitoring records, and relevant agreement provisions.
Compare Partner Spending With Authorized Funding
The company should understand:
-
Total amount authorized
-
Costs invoiced to date
-
Costs approved
-
Payments made
-
Remaining commitments
-
Expected future costs
-
Unresolved billing differences
A research partner may have completed work that has not yet been invoiced.
Conversely, an invoice may include charges that require clarification before approval.
Both situations affect the company's understanding of its financial position.
Step 10: Reconcile Federal Drawdowns to Accounting Records
For grant-funded SBIR/STTR awards, drawdown reconciliation is a separate but connected process.
The accounting team should review:
-
Federal funds authorized
-
Expenditures recorded
-
Drawdowns requested
-
Funds received
-
Cash disbursements
-
Federal cash on hand
-
Refunds
-
Credits
-
Outstanding payment requests
These records should be reconciled to the appropriate federal payment system and the company's accounting records.
Drawdowns Are Not the Same as Expenditures
A drawdown reflects federal funds requested or received.
An expenditure reflects a cost incurred and recognized under the applicable accounting and award rules.
These figures may differ during award performance.
The company should understand and support those differences.
For grant advances subject to federal cash management rules, the timing of federal fund requests must remain connected to immediate cash needs.
The company should not draw funds solely because an unused award balance is available.
NIH and PMS Reconciliation
For NIH grants, financial expenditure reporting must reconcile with the applicable Payment Management System records.
NIH's March 2026 Grants Policy Statement requires the final Federal Financial Report to show the exact unobligated balance and reconcile the federal share of expenditures with net cash disbursements reported through PMS.
Maintaining accurate records throughout the award makes this final reconciliation more manageable.
Step 11: Review Budget Variances Before Reporting
A budget variance is the difference between the approved financial plan and actual expenditures.
Not every variance indicates a compliance problem.
Research spending may change because of:
-
Delayed hiring
-
Additional technical testing
-
Lower material costs
-
Changes in consultant requirements
-
Equipment delivery delays
-
Indirect rate changes
-
Different labor requirements
-
Research partner scheduling changes
However, material differences should be investigated.
Look Beyond the Remaining Balance
Suppose the approved consultant budget is $80,000, but only $20,000 has been spent.
The company should determine whether:
-
Consultant work has been delayed.
-
Services were provided but not invoiced.
-
The work is no longer needed.
-
Costs were incorrectly coded.
-
The project schedule has changed.
-
A budget adjustment may be necessary.
A large unspent balance can be as important to investigate as a cost overrun.
NIH monitors spending patterns, including unusually accelerated or delayed expenditures, because they may signal financial management concerns or changes affecting project completion.
Step 12: Determine Whether Rebudgeting or Prior Approval Is Needed
Reconciliation may reveal that actual spending has shifted away from the original budget.
Some changes may fall within the flexibility permitted by the award.
Others may require prior approval.
Review:
-
Agency rebudgeting rules
-
Award-specific restrictions
-
Changes in scope
-
Key personnel changes
-
Equipment purchases
-
Subaward modifications
-
Indirect cost treatment
-
Cost-sharing requirements, if applicable
The company should not assume that all budget categories are freely interchangeable.
Likewise, an accounting correction is not the same as an authorized budget revision.
A cost transfer fixes where a cost was recorded.
Rebudgeting changes the financial allocation of planned work.
Each should be handled under the applicable requirements.
Step 13: Review Outstanding Commitments and Future Cash Needs
A complete reconciliation should also help management understand the resources needed to finish the project.
Consider:
-
Open purchase orders
-
Outstanding consultant commitments
-
Remaining employee effort
-
Future payroll
-
Research partner obligations
-
Equipment purchases
-
Expected indirect costs
-
Upcoming reporting and closeout expenses
Example: Remaining Budget Versus Commitments
Assume the award has $180,000 in unexpended budget authority.
The company also has:
| Outstanding Commitment | Amount |
|---|---|
| Research partner work | $45,000 |
| Consultant services | $25,000 |
| Equipment purchases | $20,000 |
| Expected remaining payroll and related costs | $65,000 |
| Total expected commitments and costs | $155,000 |
If these amounts have not already been included in recorded expenditures, the company may have only $25,000 remaining for other project needs.
Illustrative management forecast; actual accounting and obligation treatment depends on the award and the status of each commitment.
This review helps leadership identify potential funding pressure before it affects award completion.
Step 14: Determine Whether Financial Reporting Adjustments Are Necessary
When reconciliation identifies an error, the company should determine how it affects the accounting records and any prior reports.
Potential adjustments may involve:
-
Reclassifying costs to the correct project
-
Correcting payroll allocation
-
Recording missing invoices
-
Removing duplicate expenses
-
Correcting indirect cost calculations
-
Recording vendor refunds
-
Adjusting drawdown support
-
Revising prior financial information, where required
Not every error requires a revised agency report.
The appropriate response depends on the nature, amount, reporting period, and applicable agency requirements.
However, the company should not simply ignore a known difference because the financial report is due soon.
The issue should be evaluated and resolved or appropriately addressed before submission.
Step 15: Prepare a Reconciliation Support File
A reconciliation process is more effective when the company can demonstrate how its final numbers were developed.
A reporting support file may include:
Award Documents
Current award terms, approved budget, modifications, and relevant approvals.
Accounting Records
General ledger detail, trial balance, and project reports.
Payroll and Labor
Payroll registers, timekeeping, labor distribution, and reconciliations.
Indirect Costs
Applicable rate documentation, cost pools, allocation bases, and calculation schedules.
Vendor and Partner Costs
Invoices, agreements, approvals, deliverables, payment records, and supporting reports.
Federal Payments
Drawdown confirmations, PMS records, bank activity, and payment reconciliations
.
Budget Review
Budget-to-actual reports, variance explanations, and remaining-cost forecasts.
Corrections
Journal entries, cost transfer explanations, review approvals, and reconciliation notes.
This documentation helps the company explain how its reported expenditures connect to the underlying financial records.
It can also reduce the effort required when agencies request additional information.
Step 16: Establish a Monthly Reconciliation Process
Budget reconciliation should not begin only when an agency report is due.
A monthly process allows the company to identify discrepancies while supporting information is still readily available.
A typical monthly review might include:
-
Close the accounting period and reconcile cash and relevant balance sheet accounts.
-
Review project codes and general ledger activity.
-
Reconcile payroll to timekeeping and labor distribution.
-
Review direct and indirect cost classifications.
-
Update fringe and indirect cost schedules.
-
Review vendor, consultant, and subaward transactions.
-
Reconcile drawdowns or contract invoices.
-
Update the budget-to-actual report.
-
Investigate significant variances.
-
Document corrections and approvals.
-
Update the remaining-cost and cash flow forecast.
-
Save the reconciliation support file.
The review should be assigned to specific personnel.
Where practical, the person reviewing and approving reconciliations should be different from the person preparing the underlying entries.
For small companies with limited staff, appropriate compensating review controls can help strengthen the process.
Common SBIR/STTR Budget Reconciliation Problems
Several issues occur repeatedly in federally funded businesses.
1. The Project Ledger Does Not Match the General Ledger
Project reports may omit transactions or contain incorrect project assignments.
2. Payroll Allocations Do Not Match Timekeeping
Labor may be charged using outdated percentages or incorrect project codes.
3. Founder Compensation Is Not Fully Supported
Technical work may be combined with fundraising, commercial development, or administrative activity.
4. Indirect Costs Are Based on Unsupported Calculations
The company may apply an incorrect rate, use the wrong allocation base, or omit relevant cost adjustments.
5. Vendor Invoices Are Missing
Expenses may be understated because invoices have not been entered or reviewed.
6. Consultant and Subaward Spending Is Not Reconciled
Partner charges may not match approved budgets, payments, or expected deliverables.
7. Drawdowns Do Not Match Accounting Records
The company may have unresolved differences between federal payment activity and supported expenditures.
8. Budget Variances Are Not Investigated
Significant over- or underspending may reflect unrecorded costs, inaccurate forecasts, or changes in the project.
9. Costs Are Transferred Without Adequate Support
Adjustments may be made simply to reduce apparent budget overruns rather than reflect actual project benefit.
10. Reporting Begins Before Accounting Records Are Finalized
The company may submit financial information based on incomplete or unreconciled transactions.
These problems are more difficult to correct when they have accumulated over several reporting periods.
SBIR/STTR Budget Reconciliation Checklist
Before submitting an agency financial report, review the following:
-
Current award terms and approved budget have been confirmed.
-
Award modifications are reflected in the budget.
-
The general ledger is current.
-
Project ledger totals reconcile to the general ledger.
-
Direct costs are assigned to the correct project.
-
Payroll registers are complete.
-
Timekeeping supports labor allocations.
-
Labor distribution reconciles to payroll.
-
Founder compensation is appropriately classified.
-
Fringe calculations are supported.
-
Indirect cost pools and bases have been reviewed.
-
Applicable indirect rates have been confirmed.
-
Unallowable costs are identified.
-
Vendor invoices are complete and reviewed.
-
Duplicate expenses have been investigated.
-
Consultant costs reconcile to approved agreements.
-
Subaward expenses and commitments are reviewed.
-
Drawdowns or contract invoices reconcile to supporting records.
-
Federal cash on hand is understood.
-
Refunds and credits are recorded.
-
Budget variances have been investigated.
-
Rebudgeting and prior approval requirements have been evaluated.
-
Outstanding commitments are identified.
-
Remaining project costs have been forecast.
-
Corrections are documented and approved.
-
The reporting support file is complete.
-
Final reported amounts agree with the applicable accounting records.
If several items remain incomplete, the company may need to strengthen its reconciliation process before the next financial reporting deadline.
Frequently Asked Questions About SBIR/STTR Budget Reconciliation
What Is the Difference Between Budget Reconciliation and Budget-to-Actual Reporting?
Budget-to-actual reporting compares authorized amounts with recorded spending.
Budget reconciliation goes further by evaluating whether those recorded amounts are complete, accurate, properly classified, and supported by underlying documentation.
A budget-to-actual report is one important output of the reconciliation process.
How Often Should an SBIR/STTR Company Reconcile Its Award Budget?
Monthly reconciliation is a useful practice for many awardees.
The exact internal frequency should reflect the award's complexity, transaction volume, reporting obligations, and financial risk.
Additional review should occur before required agency submissions.
Do Payroll Records Need to Reconcile to SBIR/STTR Timekeeping?
Payroll costs allocated among awards and other activities need appropriate supporting records.
Timekeeping and labor distribution should support the allocation method and reconcile to corresponding payroll and accounting records.
The precise documentation requirements depend on the award and applicable cost principles.
Are Indirect Costs Included in Budget Reconciliation?
Yes.
Applicable indirect costs should be reviewed against the authorized rate treatment, supported cost pools, allocation bases, and amounts recorded.
Incorrect indirect cost calculations can affect both reported expenditures and remaining funding.
What Happens if a Vendor Invoice Is Received After the Reporting Period?
The company should determine when the underlying cost was incurred, how it should be recognized under the applicable accounting and reporting basis, and whether it affects the report.
An invoice's receipt date does not always determine the proper expenditure period.
Do Federal Drawdowns Have to Equal Expenditures Every Month?
Not necessarily.
Timing differences can occur depending on whether funds are advanced or reimbursed and when costs are incurred and paid.
The company should reconcile and explain differences while complying with applicable cash management rules.
For NIH final FFR reporting, the federal share of expenditures must reconcile with the relevant net PMS cash disbursement information.
What Should a Company Do If Its Approved Budget Does Not Match Actual Spending?
Investigate the variance.
Determine whether the difference reflects normal project timing, an accounting error, an unrecorded commitment, or a change in project requirements.
Then evaluate whether corrective entries, updated forecasts, rebudgeting, or agency approval are necessary.
Can Accounting Software Automatically Handle SBIR/STTR Budget Reconciliation?
Accounting software can support project reporting and reconciliation when properly configured.
However, the company still needs accurate source records, appropriate cost classifications, payroll allocation procedures, indirect rate support, and management review.
Software does not eliminate the need for financial oversight.
Final Thoughts: Financial Reporting Should Begin With Reconciled Records
SBIR/STTR budget reconciliation is not simply a reporting task.
It is a financial control that helps companies understand whether federal award expenditures are accurate, supported, properly classified, and consistent with the authorized funding.
A reliable reconciliation process connects project ledgers, payroll, timekeeping, labor distribution, indirect costs, vendor invoices, subaward spending, federal payments, and budget forecasts.
When these records agree, the company is better prepared to submit accurate reports and respond to agency questions.
When they do not agree, reconciliation provides an opportunity to identify the cause before the issue becomes more difficult to resolve.
At Peter Witts CPA PC, we help federally funded companies strengthen ongoing accounting, financial reporting, and reconciliation processes throughout the federal funding lifecycle.
With decades of government contract accounting experience and the perspective of a former DCAA auditor, our team helps SBIR/STTR businesses identify financial reporting weaknesses, improve cost tracking, and maintain more reliable award accounting records.
Need Help Reviewing Your Award Reconciliation Process?
If your SBIR/STTR company is approaching an agency reporting deadline or struggling to reconcile its award expenditures, now may be the right time to review the accounting records behind your financial reports.
Peter Witts CPA PC can help evaluate your project ledgers, payroll allocation, labor distribution, indirect cost calculations, vendor and subaward charges, budget variances, drawdown reconciliation, and supporting documentation.
Whether your company is managing one federal research award or multiple active projects, our team can help identify accounting gaps and strengthen the financial processes needed for accurate reporting.